产品目录
配件
标准节、地脚螺栓、附墙、滚轮、吊钩与起升绳等塔吊配件。
- 21
- 配件
配件清单
配件清单
ZN-TC-MAST-01Mast Standard SectionBolted lattice section with square-tube chords and seamless-tube bracing for tower erection.查看详情
ZN-TC-BASE-01Base FrameLoad-bearing base frame anchored to the concrete foundation, carrying the full vertical and overturning loads.查看详情
ZN-TC-SLEW-01Slewing UnitConnects the mast to the upper structure; the slewing bearing and mechanism enable 360 degree rotation.查看详情 ZN-TC-TRANS-01Transition Section (Slew Tower)Short lattice tower between the slewing bearing and the working arms. It carries both the jib and the counter-jib roots — the structural signature of a flat-top crane.查看详情
ZN-TC-HEAD-01Tower Head (Apex)Truss structure atop the mast, anchoring the jib and counter-jib pendants and taking their tension.查看详情
ZN-TC-JIB-01Jib (Working Arm)Lattice jib carrying the trolley and hook; assembled from sections to suit various working radii.查看详情 ZN-TC-TRLY-01TrolleyRuns on the two bottom chords of the jib and sets the working radius; carries the hoist rope sheaves that lead the rope down to the hook block.查看详情
ZN-TC-CJIB-01Counter-JibShort arm opposite the jib, carrying counterweights and the hoist winch to balance lifting moment.查看详情
ZN-TC-CW-01Counterweight BlockConcrete or cast-iron blocks on the counter-jib, sized to jib length and rated capacity.查看详情 ZN-TC-CAB-01Operator CabSuspended outboard of the slew tower, facing the jib so the operator sees the trolley and the load directly. Glazed on three sides with an unobstructed view arc.查看详情
ZN-TC-HOOK-01Hook BlockLifting block with hook, pulley block and latch; a high-wear spare part.查看详情
ZN-TC-ROPE-01Hoist RopeWire rope between the hoist winch and the hook; a critical high-wear part requiring regular inspection.查看详情 ZN-TC-HOIST-01Hoist MechanismWinch assembly on the counter-jib, laid out in line along the arm: drum at the tower end, then the reduction gearbox, brake and motor. The frequency-controlled drive gives the slow inching speed needed for precast placement.查看详情
ZN-TC-TIE-01Tie Rod / PendantPendant bars linking the tower head to the jib and counter-jib, taking their tension.查看详情
ZN-TC-LEG-01Embedded LegsPre-embedded steel legs cast into the concrete foundation, connecting the base frame to the ground.查看详情
ZN-TC-FBOLT-01Foundation Bolt SetHigh-strength anchor bolts fixing the base frame or legs to the concrete foundation.查看详情
ZN-TC-WT-01Wall Tie / AnchorageTie rods and anchorage frames that tie the mast back to the building above the free-standing height.查看详情
ZN-TC-ROLLER-01RollerHardened rollers that guide and carry the trolley along the jib and other moving parts.查看详情
ZN-TC-CONSOLE-01Operator ConsoleControl desk with levers, indicators and load-moment display from which the crane is driven.查看详情
ZN-TC-CABIN-01Operator CabinThe operator cabin mounted on the upper structure, giving a direct view of the load and the site.查看详情
ZN-TC-SROPE-01Safety Rope / LifelineFall-protection lifeline used by personnel working at height on the crane.查看详情 